03 · For funds and investors

Energy projects structured for international capital

Identified portfolio
USD 1.5 Bin 15 energy and data center projects
Capacity
914 MWin Mexico, the US, Belize, the Bahamas and Ecuador
Structure
1 SPVper project, with ring-fenced risk
Contract term
48–180 monthsof contracted energy

PMI is the group’s point of contact for capital. From Tampa, we structure each project in its own special purpose vehicle (SPV), with long-term energy contracts, and look for equity and project debt to take it to construction. GIS Power develops and builds the projects, and operates them for the life of the contract.

Aggregated figures for the group’s identified portfolio (project CAPEX), developed by GIS Power. Project-level detail is shared under a confidentiality agreement.

The thesis

Contracted energy, infrastructure operated for decades

Industry, industrial parks and data centers need continuous power and cannot always wait for the grid. An on-site generation project with a long-term energy contract with a creditworthy user turns that need into predictable cash flows.

The group brings what makes a project bankable: structuring and capital through PMI, and development, permits, construction and operations through GIS Power. It has done this work in critical infrastructure since 1983 and has operated power plants in Mexico since 2009.

Projects can be structured as SPVs with sponsor co-investment, power purchase agreements (PPA), leasing or BOOT.

When we are not your counterparty

  • If you need short-term liquidity: these are long-term assets.
  • If you are looking to acquire operating assets: the portfolio is in feasibility and development.
  • If your mandate excludes construction risk.

Structure

How each project is structured

What you will find in the data room
01

One SPV per project

Ring-fenced assets, contracts and debt, with each investor’s stake held in that company.

02

Energy contract

PPA, energy as a service or BOOT with the user, with a defined rate, term and performance targets.

03

Payment trust

The user’s payments flow into a trust that services the debt first.

04

Permits and interconnection

The path and status of each filing, documented.

05

Single-point construction

Design, procurement and construction by GIS Power.

06

Operations and reporting

Operations with contractual availability and regular investor reporting.

How we protect capital

Five layers between your investment and the project’s risks

Each layer covers a different risk. None of them removes risk entirely; together they reduce it and make it visible before you invest.

  1. 1
    One SPV per projectAssets, contracts and debt sit in a company created for that project only, separate from the sponsors and from the group’s other projects.
  2. 2
    Payment trustPayments flow into a trust that covers operating costs, debt and reserves in a fixed order before any distribution.
  3. 3
    EPC bonds and guaranteesPerformance and advance-payment bonds from the contractor, plus manufacturer and performance guarantees on the main equipment.
  4. 4
    Construction and operation insuranceConstruction all-risk cover and, in operation, property damage and business interruption policies.
  5. 5
    Independent engineerAn independent engineer reviews design, construction progress and start-up on behalf of lenders and investors; a data room supports your own due diligence.
Every investment carries risk. These layers reduce it; they do not eliminate it.

How we work with investors

From first conversation to close

We share information in order: first the aggregate view and, once confidentiality is signed, the detail of each project.

  1. 01 · Confidentiality agreement

    We sign an NDA to share portfolio information.

  2. 02 · Teaser

    The portfolio with its size, terms and structure, project by project.

  3. 03 · Data room

    Financial models, contracts, permits and engineering for your due diligence.

  4. 04 · Terms

    Participation structure in each SPV and closing conditions.

  5. 05 · Close and construction

    Financial close, construction and reporting during operations.

The track record behind the portfolio

Since 1983

2,900+GWh

Generated in Mexico

By the group’s plants (estimate).

430,000+h

Of continuous operation

Cumulative, across 5 plants (estimate).

13

Mission-critical facilities

Data centers and critical facilities in 3 countries.

USD 500M+

In critical infrastructure

Since 1983.

Frequently asked questions

What kind of investor are you looking for?

Infrastructure and energy funds, family offices, development banks and commercial banks, for equity or project debt.

Can I invest in a single project?

Yes. Each project sits in its own SPV, so participation can be set per project or for a group of projects.

Who operates the plants after close?

GIS Power, under an operations and maintenance contract with contractual availability, for the life of the energy contract.

Are the portfolio figures final?

No. They are provisional, aggregated figures; updated detail is shared with the teaser, under a confidentiality agreement.

Request the teaser under NDA

Tell us about your mandate: type of capital, ticket size and sectors.

Write to us directly; a member of the team replies from this address.